|
Vertical
Basic Models 02 thru 12
- Right-hand
unit shown, left hand unit opposite.
- Coil
connections determined by facing the supply-air
opening.
- Electrical
junction box is located on the same side as the
coil connections.
- Drain
pan is powder-coated epoxy with 1/4" thick
closed-cell insulation and has 3/4" NPT primary
and secondary drain connections.
- Entire
cabinet, scroll and blower wheel are heavy-gauge,
galvanized steel.
- Coil
connections: 1/2" CW on model 02-06. 3/4"
on 08-12 and 1/2" HW on 02-12.
|